Please
be advised that effective immediately the Board of Directors of MRTCA has
amended the current construction moratorium to exclude the following items.
All Restrictions of Facilities regarding approval prior to construction,
materials, etc. still apply:
1)
Snow Caps (snow roofs)
2)
Water Lines
3)
Repairs to existing structures
4)
Remodeling of existing structures
Items
3 and 4 above must meet the following criteria:
a)
Repairs/remodeling of an existing structure must not alter the footprint
of the structure.
b)
The cost of repairs/remodeling of an existing structure must not exceed
50% of the market value of the structure either (I) before the repair/remodel is
started (II) if the structure has been damaged, and is being restored, before
the damage occurred.
Application
packets for construction permits are available in the MRT office.
Copies
of MRT’s By-Laws and Restrictions of Facilities are available in the MRT
office.
Section
9 of MRTCA Restrictions of Facilities: All construction, reconstruction,
or remodel of any structure and/or waterline must be approved by the Board of
Directors. Plans need to be submitted and approved prior to the start of
work. Any revisions to approved
plans must be submitted to the Board of Directors.
Thank
you,
The
Board of Directors